Solar Express
RetCo is managing the Solar Express Project on behalf of Solar Express Transmission LLC. The Solar Express Project is a new 122 mile 500kV transmission line that will connect solar generation located in Nye County NV, Clark County, NV and Inyo County, CA with CAISO’s Eldorado substation, south of Boulder City, NV.
http://www.solarexpresstrans.com
Click
Here
West Desert Express
RetCo is managing the West Desert Express Project on behalf of West Desert Express Transmission LLC. The West Desert Express Project is a new 150 mile 230kV transmission line that will connect together the major grid systems of Utah and Nevada.
http://www.westdeserttrans.com
Click
Here
Trans West Express
The principals of RetCo were responsible for the initial development (2005 – 2008) of the TransWest Express Project - a multi-state, 725 mile, $3Bn, HVDC transmission line project that connects the exceptional wind resources of Wyoming with the California ISO system. http://www.transwestexpress.net
Click
Here
Basslink Project
The principals of RetCo were responsible for the successful development (2002- 2003) of the Basslink Project, a 220 mile, $700m, subsea HVDC transmission project connecting Tasmania with mainland Australia. Basslink remains the largest operational merchant transmission project in the world, as well as the second longest subsea transmission cable.
http://www.basslink.com.au
Click
Here
Chugwater Express
RetCo is managing the Chugwater Express Project on behalf of Chugwater Express Transmission LLC. The Chugwater Express Project is a new 90 mile, two x 230kV transmission line and collector system that will connect wind generation located near Wheatland and Chugwater, WY with PacifiCorp’s planned future Aeolus substation, near Medicine Bow, WY
http://www.wyomingcollector.com/
Click
Here